Keep the waste moving

Waste-to-Energy

Feed chutes, grates, slipstick conveyors and ash extractors

Pictured: Slipstick pans, ready to ship

01 The wear you're fighting

Municipal solid waste (MSW) arrives with glass, metal, grit and moisture in every load. In an energy-from-waste plant, that mix wears through feed chutes, grates, slipstick pans and ash extractors, and the trucks keep coming while you fix them.

You’ll find TASSCO steel in energy-from-waste plants, usually in the spots that used to fail first. We build liner systems and full weldments in house with domestic plate, matched to each wear zone and ready for your outage.

Where it wears first

  • Feed chute and feed deck liners
  • Grapple tines and flipper-lifter bars
  • Slipstick conveyor pans
  • Ash extractor rams and shear beams
  • SDA cones and turning vanes
  • Flyash elbows and screw flights
  • Impact and gouging at the feed

    Grapples drop mixed MSW into the feed chute, where scrap metal, concrete and glass hit the liners and grind down the slope sides toward the grate. Feed decks and chute liners need a hard face that takes gouging and keeps refuse sliding.

  • Wet ash that corrodes as it wears

    Bottom ash leaves the grate into a water-quenched extractor, then rides slipstick and drag conveyors as a wet, gritty, chloride-laden mix. Mild steel and even 304 stainless lose ground fast here, so these zones need a grade that handles abrasion and corrosion at once.

  • Push and shear in the ash extractor

    The extractor ram pushes wet clinker and metal up the discharge ramp and past the shear beam every cycle. Rams, push liners and shear beams take impact and sliding wear together, so clad surfaces and complete rebuilds keep the extractor on line.

  • Fine flyash in the SDA and ash system

    In the spray dryer absorber (SDA) and the flyash system, fine particles erode cones, turning vanes, elbows and dead boxes wherever the flow turns. A smooth overlay face holds up there and gives flyash less to build up on.

02 What TASSCO builds

Built off your spare set, or measured on the machine

  • Ash extractors

    • Complete ash extractor rebuilds
    • Clad rams, shear beams and push liners
    • Discharge doors, hinges and access panels
  • MSW feed and infeed

    • Feed and infeed chute liners
    • Incline and apron conveyor liners
    • Feed deck and slope side liners
  • Grate and tines

    • Grapple tine liners and tine bases
    • Flipper-lifter bars
    • Vibratory grizzly finger-deck liners
  • Slipstick conveyors

    • Feed, intermediate and discharge pans
    • Pan liners in XT and Fused Alloy
    • Feed-end extension assemblies
  • Spray dryer absorber

    • SDA wear packages
    • Turning vane sets
    • Outer cones
  • Ash and flyash handling

    • Chutes and drag conveyors
    • Screw conveyors and flighting
    • Hardened piping and elbows

04 Shop-built, field-proven

  • Complete ash extractor weldment fabricated in TASSCO's Birmingham shop
    Ash extractor weldment, built in house
  • Spray dryer absorber (SDA) outer cone for an energy-from-waste plant
    SDA outer cone

05 · How we work

One supplier, one number to call

  1. Measure

    Off your spare set, off the machine, or with LiDAR scanning and DEM modeling.

  2. Draw

    Grade, thickness, holes and bends. Kept on file for next time.

  3. Fabricate

    Cut, formed, rolled, beveled and drilled in our Birmingham shop.

  4. Deliver

    Marked and kitted for the changeout, ready to bolt up or weld in.

Questions we hear

Waste-to-Energy wear questions

Want it all on two pages? Download the Waste-to-Energy guide (PDF).

What liner lasts longest on slipstick conveyor pans?

Plants use Fused Alloy on slipstick pans and feed decks. It's a fusion-bonded chromium carbide overlay with a smooth, bead-free face, and it runs about twice the life of welded CCO. We also build pan liners in TASSCO XT.

What wear plate holds up to wet ash better than 304 stainless?

CORRHARD, a 12% chromium martensitic stainless plate. It runs nearly twice the hardness of 304 with similar corrosion resistance, and it's rated for 3–5× the life of 304 stainless where abrasion and corrosion meet, as they do in wet ash and flyash service. Your shop welds it with standard 309L practice.

Can you rebuild an ash extractor for a waste-to-energy plant?

Yes. We do complete ash extractor rebuilds and full weldments in house with domestic plate, including clad rams, shear beams, push liners, discharge doors, hinges and access panels.

How do I patch a worn chute in an energy-from-waste plant without welding?

Magna Tuff modules are 40 Shore A rubber with rare-earth magnets built in, and they snap onto steel by hand. There's no welding and no hot work permit, so you can patch it the same day. They're rated for 170°F continuous, so use them away from hot ash.

Let's talk

Tell us what's wearing out. We'll have your back.

Call us or send a note below. You'll hear back from a real person, fast.

(205) 949-2725